Electric power fittings
Keywords:
What are the responsibilities and authorities of all levels of power inspection personnel?
What are the responsibilities and authorities of power inspection personnel at all levels? (1) Power inspection personnel at all levels shall carry out periodic power inspection of customers according to this standard. (2) If the customer violates the provisions on the safe use of electricity, the electricity inspection personnel shall have the right to put forward rectification opinions and make rectification within a time limit.
Keywords:
What is the power completion inspection?
Completion inspection means that after the completion of the power supply project, the power supply enterprise shall, according to the completion report and data provided by the construction unit, organize the operation, design, construction and other units to conduct a comprehensive inspection and acceptance of the engineering quality of the power supply project in accordance with the requirements of design drawings, design procedures, operation procedures, acceptance specifications and various preventive measures.
Keywords:
Inspection and operation of high and low voltage electrical equipment and devices for power fittings
Inspection and operation of high and low voltage electrical equipment of power fittings: What is the function principle of high voltage fusing in the circuit? The interrupter is the protection element of the circuit or equipment, which is used for short circuit and overload protection of small load distribution lines and distribution transformers.
Keywords:
How to measure the polarity of current transformer by DC method in power fittings?
How to measure the polarity of current transformer by DC method in power fittings?
Keywords:
How to deal with abnormal data communication of power hardware meter reader?
When the meter reader and the computer are loaded with abnormal data, first check the meter reader and the computer connection line and connection interface to determine whether the connection is reliable. At the same time, check whether the power of the meter reader is turned on, check whether the transmission rate of the meter reader is consistent with the computer settings, and then re-run the meter reader's up or down program. If it is still unsuccessful, you can try to replace the meter reader cable or connect to another computer before loading or loading. If the meter reading data is lost due to the meter reading device, the meter reading personnel shall be notified to re-record the data on site.
Keywords:
Before the power transmission of the substation, the following inspections and tests shall be carried out on the high and low voltage electrical devices. (1) Withstand voltage test for electrical devices and insulating oil of high and low voltage power fittings.
Keywords:
Don't know how to choose for yourself?
Let us help you!
Our experts will contact you within 6 hours to meet your needs.
中文版
English